SITE & BUILDING INVESTIGATION AND REMEDIATION 02.

Hazardous Building Material & Soils Remediation

Industrial Manufacturer, Rhode Island

Mr. Graham served as Project Manager for asbestos testing and a Universal Waste inventory of four 50,000+ SF three-story industrial buildings. 

Bidding services and abatement oversight and air clearance testing were subsequently provided for this 15-acre site. The scope also included a railroad bridge spanning a major river which exhibited weathered asbestos components. Site perimeter monitoring for dust, particulate and asbestos was conducted before and during abatement activities.

These services included bridge and window removal management, development of specifications for asbestos abatement and PCB abatement in accordance with federal TSCA compliance, contractor selection assistance including bid evaluation, and coordination with town officials and residential neighbors immediately abutting the facility.

 

Also required was the design and implementation of a remedial action to remove hazardous waste identified in subsurface soils for a portion of the site, which required the following:

 

  • RIDEM Remedial Action Design & Work Plan preparation

  • Cutting/capping of utility lines

  • Removal of a leaking transformer

  • Development of specifications for PCB & PAH impacted soil excavation

  • Contractor selection assistance including bid evaluation

  • Verification and staking of property lines, and property map preparation

  • Soil Remediation monitoring and verification sampling

  • Site perimeter monitoring for dust

  • Remedial Action Completion Report preparation